SNHU – Langer Mill
Location:
Manchester, NH
Lansing Melbourne Group LLC
Owner:
Built Form, LLC
Architect:
Thomas F. Moran, Inc.
Structural Engineer:
Construction Manager:
Harvey Construction Corp.
Area:
505,681 sf
Size:
6 Levels, approx. 1,700 spaces
Precast Elements:
1346 precast concrete pieces including:
● 31 Architectural-Product
● 66 Column
● 636 Double-Tee
● 54 Girder
● 5 Grade-Spandrel
● 42 Horizontal Litewall
● 43 Lb-Spandrel
● 5 Lbeam
● 6 Nlb-Spandrel
● 68 Ramp-Spandrel
● 56 Rectangular-Beam
● 50 Shearwall
● 71 Solid-Slab
● 38 Stair
● 3 Stair-Landing
● 172 Wallpanel