top of page
Discovery Park
Location:
Cambridge, MA
Bulfinch Companies, Inc., Needham, MA
Owner:
ADD Inc., Boston, MA
Architect:
Simpson Gumpertz & Heger, Inc., Waltham, MA
Structural Engineer:
Construction Manager:
John Moriarty & Associates, Winchester, MA
Area:
196,316 sf
Size:
5 Levels, approx. 657 spaces
Precast Elements:
592 precast concrete pieces including:
• 291 precast concrete Double Tees
• 86 precast concrete Spandrels
• 67 precast concrete Bollards
• 50 precast concrete Cladding Panels
• 28 precast concrete Inverted T Beams
• 23 precast concrete Shear/K-walls
• 22 precast concrete Wall Columns
• 20 precast concrete Columns
• 5 precast concrete Stairs
bottom of page